22 km main road within 3 km of motorway (width = 27m, 2 sides, each is 3 lane)
16 km of detour road (1 side with width 9m and 2 lane)
7 bridges (6 U-turn overpass with 1 hydro bridge)
96 culverts for water and cattle passes.
The challenge of working for the project was very great because the result of the huge quantities for implementation compared to the short period specified by the company’s management for its implementation. After starting work on 10/2/2018, we prepared work schedules to ensure the preparation of the equipment, technical staff and mechanisms according to a carefully prepared program