Introducing

Kavin Construction designed and then completed the project, which cost about 8 million USD, with the best quality at a particularly difficult terrain area, including the construction of mechanical stabilized earth walls with heights of about 17 m.

The entire project was completed before the scheduled time which was 900 days.

The project posed a challenge due to its location by a mountain with no detour road to Amedi District.

Its successful completion demonstrated Kavin Construction’s commitment to successfully executing challenging projects.

Gallery