Introducing

22 km main road within 3 km of motorway (width = 27m, 2 sides, each is 3 lane) 16 km of detour road (1 side with width 9m and 2 lane) 7 bridges (6 U-turn overpass with 1 hydro bridge) 96 culverts for water and cattle passes.
The challenge of working for the project was very great because the result of the huge quantities for implementation compared to the short period specified by the company’s management for its implementation. After starting work on 10/2/2018, we prepared work schedules to ensure the preparation of the equipment, technical staff and mechanisms according to a carefully prepared program

as well as design The project is complete and we have prepared all the construction materials and all these administrative works have been prepared within 5 months, and during the year 2019 the project was fully implemented by

95%

except for maintaining the implementation of the third layer of asphalt for the year 2020 for technical matters related to the project and thus the project became the first model at the level of Iraq through the speed of implementation and quality of such projects.
Gallery