The project’s objective is the construction of a two-side main road with a width of 15 m and a length of 900 m for each side, including a two way secondary road with a width of 15 m and a length of 1 km.
The project is located at the western entrance of Duhok city and has
resulted in the reduction of traffic in that part of the city.