This project consists of constructing three underpasses and two service roads in
Duhok city. It’s considered a crucial project as it’s considered to reduce traffic up
to %80 on Dohuk’s main road. The sum length of the roads and underpasses is
more than 9 km with different widths.
Around 130,000 m2 of asphalt and 325 pre-tension precast girders with a posttension bridge of a width of 10 m and a length of 110, were used in the construction